Laserfiche WebLink
<br />. <br /> <br />application preparation costs are ~ eligible for u.s. EPA or MPCA <br />grant assistance. <br /> <br />Phases II, III and IV - III Analysis Study <br /> <br />compensation for services outlined in Phases II, III and IV shall be on <br />the basis of the Engineer's COST, including direct labor costs, <br />allowable indirect costs, and other allowable direct costs such as <br />transportation, meal and lodging expenses, equipment costs, <br />subcontracts and prb\ti~g expenses, plus a FIXED FEE. <br /> <br />For services described under Phases II, III and IV of ARTJ.CI.E II, the <br />estimated total agreement CEILING PRICE is $54,917.00 which includes a <br />FIXED FEE of $5,004.02. <br /> <br />The Engineer will bill the Owner monthly. The monthly billing will <br />summarize the direct labor hours and costs incurred. A pro rata share <br />of the FIXED FEE will also be billed monthly in proportion to the <br />progress of the project as certified by the Engineer. The Owner will <br />pay the Engineer within thirty (30) days of the billing date. <br /> <br />. <br /> <br />The total overhead rate (indirect labor and allowable indirect costs) <br />is 1.54 times actual salary. The Engineer will promptly notify <br />the Owner of changes in this rate which occur during the period of time <br />this agreement is in force. <br /> <br />- 11 - <br />