Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />: <br /> <br />(-, "'-j <br />( . <br />~ ~ <br />conduct the analysis of the sewer system within its boundaries, according to <br />federal guidelines and the conditions of this Agreement. <br /> <br />1.06. The Commission has submitted a grant application for the conduct of <br />further III analysis to the U.S. EPA and MPCA. The grant amount requested <br />reflects the current fiscal budgeting in the State's grant funding allocation <br />schedule. The application was prepared on behalf of an areawide program <br />without specific set-asides for a particular municipality. The determination <br />of the actual level of funding of the III program during the current.or future <br />fiscal funding years will be made by the MPCA. To the extent that federal and <br />state grants are provided, the Commission will administer the distribution of <br />the grant amounts to participating municipalities in accordance with the <br />provisions of the grant offer. ' <br /> <br />SECTION 2 - INFILTRATION/INFLOW ANALYSIS <br /> <br />2.01. General. The 1/1 analysis shall demonstrate the nonexistence or possible <br />existence 'of excessive 1/1 in the sewer system. The analysis should identifY <br />the presence. flow rate and type of III ,conditions which exist in the sewer <br />system. . <br /> <br />For determination of possible existence of excessive III, the analysis shall <br />include an estimate of the cost of eliminating the I/Iconditions. These <br />costs shall be compared with estimated total costs for transportation and <br />treatment of the III. Cost-effectiveness analysis guide1ines (Appendix A. <br />4D CFR 35) should be consulted with re~pect to this determination. <br /> <br />If the III analysis demonstrates the existence or possible existence of <br />excessive III, a detailed plan for a sewer'system evaluation survey shall be <br />included in the analysis. The plan shall outline the 'tasks to be performed <br />in the survey and their estimated costs. <br /> <br />2.02. City Participation in General. The City shall be responsible for <br />completion of the III analysis and may retain a consulting enqineering firm, <br />in accordance ~/ith 40 CFR 35. to assist in carrying out the analysis.' . <br /> <br />The City shall submit engineering reports detailing the findings of 'the study <br />to the MPCA for their review and approval. <br /> <br />2.03. Commission Participation in General. The Commission hils 'lublished a <br />oublic notice in accordance with 40 CFR 35.927 inviting interested persons or <br />firms to submit statements of qualifications for' engineering services relating <br />to the III anaTysiS. direct1y to the qualifying communities. <br /> <br />To the extent that federal and state grants are provided. the Commission will <br />administer the distribution of the grant amounts 'to participating municipalities <br />in accordance with the provisions of the grant offer and any priority scheduling <br />established by ~lPCA. <br /> <br />V-2 <br />