Laserfiche WebLink
<br />" <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />. <br />.~ <br /> <br />conduct the analysis of the sewer system within its boundaries, according to <br />federal guidelines and the conditions of this Agreement. <br /> <br />1.06. The Corrnnission has submitted a grant application for the conduct of <br />further III analysis to the U.S. EPA and MPCA. The grant amount requested <br />reflects the current fiscal budgeting in the State's grant funding allocation <br />schedule. The application was prepared on behalf of an areawide, program <br />,without specific set-asides for a particular municipality. The determination <br />of the actual level of funding of the III program quring the current or future <br />fiscal funding years will be made by the MPCA. To the extent that federal and <br />state grants are provided, the Corrnnission will administer the distribution of <br />the grant amounts to participating municipalities in accordance with the <br />provisions of the grant offer. . <br /> <br />SECTION 2 - INFILTRATIONIINFLOW ANALYSIS <br /> <br />2.01. General. The III analysis shall demonstrate the nonexistence or possible <br />existence of excessive III in the sewer system. The analysis should identify <br />the presence, flow rate and type of. III conditions which exist in the sewer <br />system. <br /> <br />for determination of possible existence of excessive III, the'analysis shall <br />include an estimate of the cost ofeliminatir19 the III conditions. These <br />costs shall be compared with estimated total costs for transportation and <br />treatment of the III. Cost-effectiveness analysis guidelines (Appendix A, <br />40 CFR 35) should be consulted with respect to this determination. <br /> <br />If the 1/1 analysis demonstrates the existence or possible existence of <br />excessive III, a detailed plan for a sewer system"evaluation survey shall be <br />included in the a'nalysis. The plan shall outline the tasks to be performed <br />in the survey and their estimated costs. <br /> <br />2.02. City Participation in General. The City shall be responsible for <br />completion of the 1/1 anal,vsis and may retain a consultin!) enqineering firm, <br />in accordance with 40 CFR 35, to assist in carrying out the analysis. . , <br />The City shall submit engineering reports detailing the findings of 'the study <br />to the MPCA for their review and approval. <br /> <br />2.03. Commission Participation in General. The Corrnniss~on hilslJllblisheda <br />Dublic notice in accordance with 40 CFR 35.927 inviting lnterested persons ~r <br />firms to submit statements of qualifications for'engineering services relatlng <br />to the 1/1 analysis, directly to the qualifying corrnnunities. <br /> <br />To the extent that federal and state grants are provided, the Commission will <br />administer the distribution of the grant amounts to participating municipalities <br />in accordance with the provisions of the grant offer and any priority scheduling <br />establ ished by I1PCA. <br /> <br />V~2 <br />