My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-04-23-PC Agenda
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2023
>
10-04-23-PC Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2023 2:05:06 PM
Creation date
9/28/2023 2:03:00 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Applications - Plan applications for solar energy systems shall be accompanied by to -scale <br />horizontal and vertical (elevation) drawings. The drawings must show the location of the system on <br />the building or on the property for a ground -mount system, including the property lines. <br />Plan Approvals - Applications that meet the design requirements of this ordinance shall be granted <br />administrative approval by the zoning official and shall not require Planning Commission review. Plan <br />approval does not indicate compliance with Building Code or Electric Code. <br />G. Approved Solar Components - Electric solar energy system components must have a UL or equivalent <br />listing and solar hot water systems must have an SRCC rating. <br />H. Compliance with Building Code - All solar energy systems shall meet approval of local building code <br />officials, consistent with the State of Minnesota Building Code, and solar thermal systems shall comply <br />with HVAC-related requirements of the Energy Code. <br />I. Compliance with State Electric Code - All photovoltaic systems shall comply with the Minnesota State <br />Electric Code. <br />J. Compliance with State Plumbing Code - Solar thermal systems shall comply with applicable Minnesota <br />State Plumbing Code requirements. <br />K. Utility Notification - All grid-intertie solar energy systems shall comply with the interconnection <br />requirements of the electric utility. Off -grid systems are exempt from this requirement. <br />Minnesota Model Solar Ordinance <br />
The URL can be used to link to this page
Your browser does not support the video tag.