My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-04-23-PC Agenda
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2023
>
10-04-23-PC Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2023 2:05:06 PM
Creation date
9/28/2023 2:03:00 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Solar -Ready Buildings — Model Community encourages <br />builders to use solar -ready design in buildings. Buildings that <br />submit a completed U.S. EPA Renewable Energy Ready Home <br />Solar Photovoltaic Checklist (or other approved solar -ready <br />standard) and associated documentation will be certified as <br />a Model Community solar ready home, and are eligible for <br />low-cost financing through Model Community's Economic <br />Development Authority. A designation that will be included in <br />the permit home's permit history. <br />D. Solar Access Variance — When a developer requests a variance <br />from Model Community's subdivision solar access standards, <br />the zoning administrator may grant an administrative exception <br />from the solar access standards provided the applicant meets <br />the conditions of 1. and 2. below: <br />1. Solar Access Lots Identified - At least _% of the lots, or a <br />minimum of _ lots, are identified as solar development <br />lots. <br />Covenant Assigned - Solar access lots are assigned a <br />covenant that homes built upon these lots must include a <br />solar energy system. Photovoltaic systems must be at least <br />three (3) KW in capacity. <br />Additional Fees Waived - Model Community will waive any <br />additional fees for filing of the covenant. <br />Minnesota Model Solar Ordinance 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.