Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for November 8, 2023 <br />P:\Planning\Planning Cases\2023\PC 23-018, Wahlberg Solar Energy System – CA <br />Page 5 of 8 <br /> <br />proposed solar energy system within the R-1, R-2, and R-3 zoning districts and the NR-1, NR-2, <br />and NR-3 zoning districts would apply for administrative review and approval through the building <br />and electric permit process as drafted in the proposed ordinance amendments. <br /> <br />Staff has prepared text amendments based on the Applicant’s narrative, the Minnesota Solar Model <br />Ordinance, ordinances of neighboring communities, and the comments from All Energy Solar for <br />“Solar Energy System” language within Sections 1320.05 Land Use Chart, 1325.02 Accessory <br />Uses, 1328 5.0 Schedule of Permitted Uses, and 1328 5.2 Additional Use Criteria. Amendments <br />were also made to Section 1380 6.1 General to All Zoning Districts to address solar energy system <br />heights in residential zoning districts. The entire redlined versions of the proposed text <br />amendments for Planning Commission consideration are included as Attachment E, F, G and H. <br />Below is a summary of the proposed ordinance amendments: <br /> <br />Proposed Code Amendments to Consider: <br />1) The Land Use Chart within Section 1320.05 would be amended to include solar energy <br />system as an accessory use for residential districts: <br />a. Add Solar Energy System as an Accessory Use under the R-1, R-2, and R-3 <br />Districts. <br /> <br />2) Amend Section 1325.02 Accessory Uses <br />a. Create a new Subdivision 7 that outlines special provisions for Solar Energy <br />Systems as an accessory use in the R-1, R-2, and R-3 Residential Zoning Districts. <br />i. Establish height, setback, visibility, and coverage requirements for solar <br />energy systems based on existing regulations for the R-1, R-2, and R-3 <br />residential districts and accessory structures. <br />1. Establish that review will include consideration for screening and <br />aesthetics. <br />ii. Differentiate between regulations for roof-mounted and ground- or pole- <br />mounted solar energy systems. <br />iii. Explain the administrative approval process and required submission <br />materials for solar energy systems. <br />iv. Highlight that all solar energy systems require a building permit application <br />and approval that is distinct from administrative approval. <br /> <br />3) Amend Section 1380 5.1 Schedule of Uses <br />a. Add Solar Energy System as an Accessory Use with Criteria under the NR-1, NR- <br />2, and NR-3 Districts. <br /> <br />4) Amend Section 1380 Section 5.2 Additional Use Criteria <br />a. Create an Accessory Use with Criteria for Solar Energy Systems that states Solar <br />Energy Systems shall conform to the provisions included in Section 1325.03, Subd. <br />7 of the AHC. <br /> <br />5) Amend Section 1380 Section 6.1 General to All Zoning Districts