My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-23-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2023
>
11-13-23-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 9:57:07 AM
Creation date
11/9/2023 3:55:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL SPECIAL WORK SESSION — NOVEMBER 13, 2023 2 <br />2. RESPONSE TO PUBLIC INQUIRIES <br />None. <br />3. AGENDA ITEMS <br />A. 2024 Budget Discussion <br />City Administrator Perrault noted that the City Wide Budget Summary for 2024 includes the <br />General Fund, Utility Fund and Special Revenue Funds. Council had seen the CIP previously in <br />July, the Operating Budget in August, the General Fund Preliminary Levy was approved in <br />September. There is $15.5 million in revenue coming into the City, and expenditures of $19.8 <br />million. The large discrepancy is generally from CIP projects. <br />City Administrator Perrault explained pie charts that showed the City Wide Summary by type. <br />He reviewed Wages and Benefits for 2024, with total personnel costs increasing by $253,490 from <br />2023 to 2024. In the General Fund Revenues property taxes were increasing by 13.7%. He <br />explained the other types of revenue included in the General Fund. <br />City Administrator Perrault described the General Fund Expenditures, and the 2024-2028 CIP. <br />He explained the dollars set aside for Economic Development in 2025 and 2027 were for gateway <br />signs. He showed a chart of the 2024 Capital Projects, and noted that in the Utility Funds water <br />would not increase, sewer will increase by 3% and surface water will increase by 5%. Based on a <br />household of 9,000 gallons used there will be an increase from $221 to $225. <br />City Administrator Perrault reviewed the Tax Impact of the 12.55% levy over 2023, the Tax <br />Levy history, compared Arden Hills with 2023 Tax Rates for other cities in Ramsey County, and <br />the Proposed Tax Levy for 2024. He explained the other funds that rely on Tax Levy dollars; EDA <br />Fund, Public Safety Capital Fund, Equipment/Building Replacement Fund and the PIR Fund. <br />City Administrator Perrault stated the current wage and benefit assumptions include a 3% <br />COLA, insurance benefits are increasing by 10% for health and 4% for dental. Changes being <br />made within the Lake Johanna Fire Department will require future additional levy increases. He <br />wondered what levy the Council would like to consider for the Truth in Taxation meeting in <br />December which is currently at 12.55%. The amount cannot be raised but can be lowered. <br />Councilmember Holden said in the statewide budget summary for 2023 there was a negative <br />$900,000 but yet at an earlier meeting it was said there would be about $200,000 carry over. Was <br />that still true? <br />City Administrator Perrault said they will come in under budget on the expenditure side, mostly <br />due to salary savings. However, on the revenue side they are down on building permit revenue as <br />there haven't been any large construction projects this year. Conservatively $200,000 is what he <br />would predict. <br />Councilmember Monson stated they had a shortfall in revenue, but staff vacancies that allowed <br />cushion on expenditures. She asked if this was a common pattern? <br />
The URL can be used to link to this page
Your browser does not support the video tag.