Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—OCTOBER 23, 2023 5 <br /> MOTION: Councilmember Holden moved and Councilmember Monson seconded a <br /> motion to approve the Consent Calendar as amended and to authorize <br /> execution of all necessary documents contained therein. The motion carried <br /> fLL <br /> 9. PULLED CONSENT ITEMS <br /> A. Motion To Approve Resolution 2023-051 Designating Certain City-Owned <br /> Property As "Triangle Park" <br /> Councilmember Holden stated this was a major gateway property for the City that was heavily <br /> used. She expressed concern that the proposed park name was not fitting. She suggested action on <br /> this item be tabled and that this item be brought back to the PTRC. <br /> MOTION: Councilmember Holden moved and Mayor Grant seconded a motion to table <br /> action on this item directing staff to bring this item back to the PTRC for <br /> further consideration. The motion carried (S-0). <br /> B. Motion To Approve Olson Engineering Proposal For Geophysical Subsurface <br /> Investigation At 3245 New Brighton Road—Hazelnut Parking Lot Project <br /> Councilmember Monson requested further information from staff on this item. She asked if the <br /> City would be paving the church parking lot. <br /> City Administrator Perrault stated the City of Arden Hills utilizes the parking lot at 3245 New <br /> Brighton Road via Joint Use Agreement with the Church dated August 8, 2011. The current <br /> condition of the parking lot is beyond its useful life and is in need of pavement rehabilitation. The <br /> City has had ongoing conversations with the Church representatives over the past several years in <br /> attempt to plan for the project. When planning for pavement projects it is necessary to order <br /> geotechnical services to assist in estimated construction costs. The City had ordered soil borings <br /> in 2019 at two locations at the parking lot to examine the existing pavement section and determine <br /> the recommended pavement section to be constructed. Recently, City staff had learned of the <br /> possibility of"ground rubber tire fill" layer used during the last reconstruction of the parking lot. <br /> This layer was not identified through the soil borings. The City and the Church decided it was <br /> important to investigate the possible tire layer further before moving forward with the project. <br /> Public Works Director/City Engineer Swearingen reported City staff has reached out to Olson <br /> Engineering, a firm that has specialized equipment that identifies subsurface material properties <br /> via ground penetrating radar. The geophysical subsurface investigation will provide valuable <br /> information necessary in determining the actual work required to construct a long-term reliable <br /> pavement surface. Olson Engineering has provided a proposal in Attachment A. Staff has visited <br /> with the consultant on site and reviewed the proposal. City staff recommends Council approve the <br /> quote to investigate the subsurface for the rubber tire layer. <br />