Laserfiche WebLink
Attachment B <br />1325.08 Filling and Excavation. <br />Subd. 1 Permit Required. nffl -Ad- 'i i-Str^tive peFn+it A Grading and Erosion Control <br />permit also subject to Chapter 15 shall be required for any filling or excavation of up to four <br />hundred (400) cubic yards per parcel, or four hundred (400) cubic yards per acre, <br />whichever is greater. Operations of over the above -described amounts shall be considered <br />land reclamation or mining, and shall require a conditional use permit in accordance with <br />ChapteF 8 Section 1355.04, Subd. 3 of the Arden Hills Code of Ordinances. <br />Subd. 2 Exceptions. The following operations are excepted from the preceding permit <br />requirements: <br />A. Excavation Felated to the constFuction of a building with a duly issued buildin <br />permit; <br />B. Filling, exc-avatior and gadinga-sseciated14.4-tin site impFevemexts and s <br />pr-epaFati approved subdivision or- site plan; <br />A. Excavation for construction of existing public streets and utilities; <br />D-.B. Filling, excavation, or movement of less than one hundred fifty(4—W50) cubic <br />yards of earth for landscaping purposes on a lot already occupied by a residential <br />structure; <br />lL C. Minor agricultural or conver-s tion conservation operations. <br />Subd. 3 Type of Fill. Fill to be placed on sites shall be subject to City Engineer approval. <br />must be gravel, sand, dirl, clay or- other- non -decomposable material similar- to natural soils <br />found in the uplandarea f Arden u;ns. Building construction materials, concrete, <br />bituminous, and soils containing hazardous or toxic waste, predominately organic <br />materials, household wastes, mechanical debris, etc., shall not be permitted. <br />been issued shall be completed within a period of one hundred and twenty (120) days f�om <br />Subd. 4 PeFfaFmanee Time. Filling and excavation opeFations for- which a permit has <br />mess an „xt,,nsio,, ; requested of and granted by the G tom. Council. <br />Subd. 4-5 Periodic Operations. Periodic filling or excavation of amounts less than four <br />hundred (400) cubic yards per parcel or per acre shall be allowed under separate <br />,aw„�;�t, ,t;•,o Grading and Erosion Control permits until the composite total of such <br />periodic operations exceeds four hundred (400) cubic yards. Further operations will then <br />be subject to a conditional use permit in accordance with Section 1355.04, Subd. 3 tie <br />of the Arden Hills Code of Ordinances. <br />Subd. 56 Submissions. The applicant for a Grading and Erosion Control permit shall <br />submit the information outlined in Chapter 15 Section 1520 - Erosion and Sediment <br />Control Plans and Review. following it-f^r"'Ation- <br />n n legal description, plator-survey Fproperty t be alter-ed. <br />