Laserfiche WebLink
H:\P,.j c \16000\16750\T-hDal DHi-bi.Das\EstimateQty \ <br />16750_Cost Estimate_SEQ_Tr port_Sp.Yr_2020.isx <br />SRF C-thg Group, Inc. <br />ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COST <br />OLD HIGHWAY 10 TRAIL CONSTRUCTION <br />ARDEN HILLS, MN <br />NOVEMBER 22ND, 2023 <br />+JIIF �CiYB] <br />Attachment B <br />ITEM NO. <br />ITEM DESCRIPTION <br />UNIT <br />UNIT COST <br />TOTAL <br />QUANTITY <br />AMOUNT <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$ 170,000.00 <br />1 <br />$ 170,000.00 <br />2101.505 <br />CLEARING <br />ACRE <br />$ 11,000.00 <br />0.6 <br />$ 6,600.00 <br />2101.505 <br />GRUBBING <br />ACRE <br />$ 8,000.00 <br />0.6 <br />$ 4,800.00 <br />2104.502 <br />REMOVE BITUMINOUS FLUME <br />EACH <br />$ 1,500.00 <br />2 <br />$ 3,000.00 <br />2104.502 <br />SALVAGE SIGN <br />EACH <br />$ 60.00 <br />11 <br />$ 660.00 <br />2104.503 <br />SAWING CONCRETE PAVEMENT FULL DEPTH <br />LIN FT <br />$ 4.00 <br />72 <br />$ 288.00 <br />2104.503 <br />SAWING BIT PAVEMENT (FULL DEPTH) <br />LIN FT <br />$ 1.50 <br />6826 <br />$ 10,239.00 <br />2104.503 <br />REMOVE CURB & GUTTER <br />LIN FT <br />$ 6.00 <br />387 <br />$ 2,322.00 <br />2104.503 <br />REMOVE BITUMINOUS CURB <br />LIN FT <br />$ 3.00 <br />114 <br />$ 342.00 <br />2104.504 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SO YD <br />$ 8.00 <br />572 <br />$ 4,576.00 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT <br />SO YD <br />$ 6.00 <br />2995 <br />$ 17,970.00 <br />2104.518 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SO FT <br />$ 14.00 <br />894 <br />$ 12,516.00 <br />2105.607 <br />EXCAVATION - COMMON <br />CU YD <br />$ 10.00 <br />2000 <br />$ 20,000.00 <br />2106.507 <br />COMMON EMBANKMENT CV <br />CU YD <br />$ 7.00 <br />5000 <br />$ 35,000.00 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIX 4,F <br />TON <br />$ 90.00 <br />360 <br />$ 32,400.00 <br />2360.509 <br />TYPE SP 12.5 WEARING COURSE MIX 4,F <br />TON <br />$ 91.00 <br />110 <br />$ 10,010.00 <br />2411.618 <br />PREFABRICATED MODULAR BLOCK WALL <br />SO FT <br />$ 95.00 <br />3269 <br />$ 310,555.00 <br />2411.618 <br />ANTI -GRAFFITI COATING <br />SO FT <br />$ 2.00 <br />3269 <br />$ 6,538.00 <br />2411.618 <br />ARCH SURFACE FINISH MULTI COLOR <br />SO FT <br />$ 8.00 <br />3269 <br />$ 26,152.00 <br />2451.507 <br />COARSE FILTER AGGREGATE CV <br />CU YD <br />$ 70.00 <br />88 <br />$ 6,160.00 <br />2451.607 <br />STRUCTURAL BACKFILL <br />CU YD <br />$ 55.00 <br />2422 <br />$ 133,210.00 <br />2502.503 <br />4" TP PIPE DRAIN <br />LIN FT <br />$ 12.00 <br />250 <br />$ 3,000.00 <br />2502.503 <br />4" PERF TP PIPE DRAIN <br />LIN FT <br />$ 14.00 <br />1819 <br />$ 25,466.00 <br />2521.518 <br />6" CONCRETE WALK <br />SO FT <br />$ 11.00 <br />170 <br />$ 1,870.00 <br />2531.503 <br />CONCRETE CURB & GUTTER DESIGN B624 <br />LIN FT <br />$ 26.00 <br />6018 <br />$ 156,468.00 <br />2531.504 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SO YD <br />$ 81.00 <br />570 <br />$ 46,170.00 <br />2540.602 <br />RELOCATE MAIL BOX SUPPORT <br />EACH <br />$ 200.00 <br />19 <br />$ 3,800.00 <br />2540.618 <br />BOARDWALK <br />SO FT <br />$ 110.00 <br />7000 <br />$ 770,000.00 <br />2557.503 <br />WIRE FENCE DESIGN 48V-9322 <br />LIN FT <br />$ 40.00 <br />910 <br />$ 36,400.00 <br />2564.602 <br />INSTALL SIGN <br />EACH <br />$ 500.00 <br />11 <br />$ 5,500.00 <br />EROSION CONTROL <br />LUMP SUM <br />$ 170,000.00 <br />1 <br />$ 170,000.00 <br />STORMWATER BMP <br />LUMP SUM <br />$ 100,000.00 <br />1 <br />$ 100,000.00 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$ 90,000.00 <br />1 <br />$ 90,000.00 <br />STORM SEWER <br />LUMP SUM <br />$ 850,000.00 <br />1 <br />$ 850,000.00 <br />SUBTOTAL <br />$ 2,902,012.00 <br />F_ <br />CONTINGENCY (10%) <br />$ 290,201.20 <br />TOTAL <br />$ 3,192,213.20 <br />PAGE 1 OF 1 <br />