My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-018
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2020-2029
>
2023
>
2023-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:00:42 PM
Creation date
12/12/2023 3:00:32 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRICAL PERMIT FEES <br />HOMEOWNERS AND CONTRACTORS:Complete an electrical permit form available from the Building Inspections <br />Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number <br />of inspection trips x $.00, whichever is greater. <br />Residential panel replacement is $110.00, sub <br />panel $.00. New service or power supply is: Circuits and Feeders <br />0 to 300 Amp $55.00 0-100 Amp $9.00 <br />400 Amp $71.00 101-200Amp $15.00 <br />Add $16.00 for each additional 100 amps <br />Minimum Fee: <br />Minimum permit fee is $.00 plus $1.00 State <br />surcharge. This is for one inspectio only. <br />Minimum fee for rough-in and final inspection is <br />$.00 plus $1.00 State surcharge. <br />Add $6.00 for each additional 100 amps <br />Maximum Fee: <br />Maximum fee for single family dwelling or <br />townhouse not over 200 amps (No max if <br />service is over 200Amps) is $.00 plus <br />$1.00 State surcharge. Maximum of 2 rough-in’s and 1 final <br />inspection. (Failed inspections are an additional $.00 each) <br />Apartment Buildings <br />Fee per unit of an apartment or condominium complex is $0.00. <br />This does not cover service, unit feeders or house panels. <br />$0.00 plus circuits at $9.00/each. This includes 2 inspections. <br />$0.00 this include up to 10 circuits and 2 inspections <br />The Greater of $55.00 for panel plus $9.00 per circuit or $0 for <br />2 inspections. <br />$5.00 per each standard <br />$5 up to 10kva, $4 11 to 74kva, $60 75kva to 299kva, over <br />299kva is $165 <br />Swimming Pools and Hot Tubs Additions, <br />Remodels or <br />Basement Finishes <br />Residential Accessory Structures <br />Street and Parking Lot Lights <br />Transformers and Generators <br />Retrofit Lighting <br />Sign Transformer or Driver <br />Low voltage fire alarm, low voltage <br />heating and air conditioning control wiring <br />Re-Inspection Fee in addition <br />to all other fees <br />$.00 <br />Solar fees: <br />0kw to 5kw = $90 5.1kw to 10kw = $150 <br />10.1kw to 20kw = $225 20.1kw to 30kw = $300 <br />30.1kw to 40kw = $375 40.1kw and larger is $375 plus $25 for each additional 10kw <br />Electronic inspection fee for these items only; furnace, air conditioning, bath fan, fireplace or receptacle for water <br />heater vent is $40. <br />Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities 20% handling fee. <br />THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED.
The URL can be used to link to this page
Your browser does not support the video tag.