My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
12-18-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 11:01:51 AM
Creation date
12/14/2023 11:00:33 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM — 3A <br />,AI�EN HILLS <br />MEMORANDUM <br />DATE: December 18, 2023 <br />TO: Honorable Mayor and City Councilmembers <br />Dave Perrault, City Administrator <br />FROM: David Swearingen, P.E. Public Works Director / City Engineer <br />SUBJECT: South Tower Improvements Project Discussion <br />Budgeted Amount: Actual Amount: Funding Source: <br />$250,000 (2024 CIP) $443,017 (estimate) Water Utility Fund, UASI grant <br />Council Should Consider <br />Council should consider: <br />The proposed South Tower Improvements related to repairs and security elements. <br />Adjusting the project budget to fit needs. <br />Background/ Discussion <br />On August 28, 2023 the City Council approved Professional Services Agreement with TKDA for <br />the South Tower Improvements project. <br />Within the City's Capital Improvement Plan (CIP) the South Tower is planned for improvements <br />in 2024. Public Works ordered an inspection of the South Tower that was completed Fall of <br />2022, the report recommendations include spot coating repairs, minor structural repairs and other <br />improvements related to OSHA requirements. <br />Along with the recommended repairs, it is desired to include security improvements that were <br />identified in the City's Water Risk and Resiliency Assessment to the South Tower with this <br />project. Below are some options that are being considered: <br />a. 8-ft Security perimeter fencing and gates <br />b. Bollards for booster station generator <br />C. Replace plywood cover of lower level access with lockable cover <br />d. Card reader for site access control <br />e. Intrusion alarms for overhead doors at booster station and water tower <br />Page I of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.