Laserfiche WebLink
Page 15 of 16 <br /> <br />Master and Final PUD Development Agreement shall be fully executed prior to the <br />issuance of building permits. <br />5. Prior to the issuance of a building permit, a landscape financial security equal to 125% of <br />the cost of the landscaping to be installed on the site shall be submitted. The Applicant <br />must submit a detailed cost estimate for the landscaping so staff can determine the final <br />amount. Landscape financial security shall be held for two full growing seasons. For any <br />landscaping that is not in accordance with the approved landscaping plan at the end of <br />two growing seasons, the Developer shall replace the material to the satisfaction of the <br />City before the guarantee is released. Where this is not done, the City, at its sole <br />discretion, may use the proceeds of the performance guarantee to accomplish <br />performance. <br />6. A Grading and Erosion permit shall be obtained from the city’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The Applicant <br />shall be responsible for obtaining any permits necessary from other agencies, including <br />but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County <br />(i.e ROW or access) prior to the start of any site activities. <br />7. The final plans shall be subject to approval by the City Engineer, Building Official, and <br />Fire Marshal prior to the issuance of a grading and erosion control permit. <br />8. Final grading, drainage, utility, and site plans shall be subject to approval by the Public <br />Works Director, City Engineer, and City Planner prior to the issuance of a grading and <br />erosion control permit or other development permits. <br />9. Upon completion of grading and utility work on the site, a grading as-built and utility as- <br />built shall be provided to the City for review. <br />10. Heavy duty silt fence and adequate erosion control around the entire construction site <br />shall be required and maintained by the Developer during construction to ensure that <br />sediment and storm water does not leave the project site. <br />11. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />12. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. <br />13. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />14. A separate zoning permit shall be required for a new fence on the site. <br />15. A separate sign permit shall be required for all signs on the site. <br />16. Any future trash and vacuum enclosures shall utilize gates and be constructed on three <br />sides using the same materials and patterns used on the building. Locations shall be <br />approved by the Planning Department. <br />17. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be memorialized in the Development Agreement. <br />18. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br />shall be sodded or seeded and maintained. The property owner shall mow and maintain <br />all site boulevards to the curb line of the public streets. <br />19. The proposed structures shall conform to all other regulations in the City Code. <br />20. The Applicant shall provide a copy of the Stormwater Management Report and <br />verification of Rice Creek Watershed approval prior to the approval of Development <br />Agreement.