Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - MARCH 26,2001 <br /> <br />5 <br /> <br />Mr. Steve Doughty, Pope & Associates, the architect, stated there was a lot of discussion at the <br />Planning Commission on the height of the building. He stated they could use the grade change <br />to their advantage to have parking at a lower grade. He noted that was part ofthe unsurety. He <br />added they are trying to get some frame around the building to understand the broad scope. He <br />stated the maximum height would probably be 100 feet. He noted ifthere needed to be some <br />clarification, they we could look at that the 85-foot to 140 foot range. There is the chance a user <br />could come in and need a variation. He stated they are trying to get a broad definition, but do not <br />want to allow an elephant onto the site. <br /> <br />Mr. Shardlow stated the Council would be surprised how high 100 feet is. He noted this is the <br />site in the gateway area where a signature building should be. He added it is consistent with the <br />New Brighton side. He stated ifthey are going to get a corporate headquarters that is the site <br />they want it to be on. <br /> <br />Mr. Carlson stated they worked backwards. He noted they looked at the given constraints if they <br />did have a corporate user. He added they also considered what would be a typical floor plate for <br />such a user and what the site would accommodate. He stated that is how they came up with the <br />approximate eight stories. He noted how the ultimate shape comes out depends on the user. He <br />added some users want larger floor plates, but may have less height. <br /> <br />Mayor Probst asked about the Veritas building in Roseville. Mr. Doughty responded it is a five- <br />story building. He stated the Norman Points building is a seven-story building. He noted some <br />design measures were done too. <br /> <br />Mr. Shardlow stated the Roseville development on Snelling Avenue is eight stories. He stated <br />they would not intend that the whole footprint would be raised up eight stories. <br /> <br />Mr. Carlson stated they have tried to address the outside limitations so there are no unexpected <br />results. <br /> <br />Mayor Probst stated he could see the logic in trying to have the signature building. He noted <br />New Brighton is trying to accomplish the same thing across the freeway. He added they should <br />try to set these standards up to accomplish it in the same way. He stated the Medtronic facility <br />is the kind of thing every community wants. He added he is comfortable with where they want <br />to go, but is concerned ifthey do not find that user. <br /> <br />Mr. Carlson stated they are trying to provide that by pushing the office requirement office. He <br />noted the topside of the development and the bottom side has been addressed. He added they are <br />looking for the highest and best quality for that property. <br /> <br />Councilmember Larson stated the bottom line is having a first class user on this site. He noted <br />he is comfortable with the height. He added he has other concerns and asked what constitutes a <br />permitted accessory use. Ms. Chaput responded an accessory use is defined as a secondary use <br />to the primary use of the property. She stated they evaluated the uses allowed in the Gateway <br />Business District. She noted the Planning Commission had added that it could only be class one <br />use. <br />