Laserfiche WebLink
Summary of Preliminary Estimated Costs <br />Bidding Schedule <br />Base Bid <br />Alternate 1 <br />(Trails, ADA, & Retaining Wall Improvements) <br />Alternate 2 <br />(Pond Dredging) <br />Total Project <br />Estimated Construction Cost <br />$2,140,000 <br />$145,000 <br />$80,000 <br />$2,365,000 <br />Estimated Project Cost <br />$2,720,000 <br />$180,000 <br />$100,000 <br />$3,000,000 <br />• Construction Cost Includes 10% contingency <br />• Project Cost Includes 27% for indirect overhead costs BOLTON 'It <br />Design, Admin Legal, etc. Q & MEN K <br />(Engineering 9 9 � ) -A�EN�HILLS <br />Real People. Real Solutions. <br />