My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-24-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
01-08-24-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:52:10 AM
Creation date
1/12/2024 3:07:20 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of Preliminary Estimated Costs <br />Bidding Schedule <br />Base Bid <br />Alternate 1 <br />(Trails, ADA, & Retaining Wall Improvements) <br />Alternate 2 <br />(Pond Dredging) <br />Total Project <br />Estimated Construction Cost <br />$2,140,000 <br />$145,000 <br />$80,000 <br />$2,365,000 <br />Estimated Project Cost <br />$2,720,000 <br />$180,000 <br />$100,000 <br />$3,000,000 <br />• Construction Cost Includes 10% contingency <br />• Project Cost Includes 27% for indirect overhead costs BOLTON 'It <br />Design, Admin Legal, etc. Q & MEN K <br />(Engineering 9 9 � ) -A�EN�HILLS <br />Real People. Real Solutions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.