My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
01-08-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:49:46 AM
Creation date
1/12/2024 3:08:32 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
521
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />2024 SCHEDULE F FEES <br />The following fee schedule is based upon <br />competent, responsible professional services <br />and is the minimum,belowwhich adequate <br />professional standards cannot be maintained. <br />It is, therefore, to the advantage of both <br />the professional and the client that fees be <br />commensurate with the service rendered. <br />Charges are based on hours spent at hourly <br />rates in efFectforthe individuals performing <br />the work_ The h o urly rates for grin cipals a nd <br />members of the staff vary according to skill <br />and experience_ The current specific billing <br />rate for any individual can be provided upon <br />request. <br />The fee schedule shall apply for the period <br />through December 31, 2024_ These rates may <br />be adjusted annually thereafterto account <br />for changed labor casts, inflation, or changed <br />overhead conditions. <br />These rates include labor, general business, <br />and other normal and customary expenses <br />associated with operating a professional <br />business. For projects with typical expenses <br />and unless otherwise agreed, the above <br />rates include vehicle and personal expenses, <br />miileage, telephone, survey stakes, and <br />routine expendable supplies; no separate <br />charges will be made for these activities <br />and materials. Expenses beyon d typi cal <br />project expenses, non -routine expenses, <br />and expenses beyond the agreed scope <br />of services, such as out of town travel <br />expenses, Iongtravel distances, large <br />quantities of prints, extra report copies, <br />outsourced graphics and photographic <br />rep rodu citions, document recording fees, <br />outside professional and technical assistance, <br />and other items of this general nature will be <br />invoiced separately. Rates and charges do not <br />in clu de sa les tax, if applicable_ <br />Senior Project Manager <br />$1 W 261 <br />Project Manager <br />$145-231 <br />Senior Project Engineer <br />$14& 216 <br />Project Engineer <br />$I W 2111 <br />Rsiln Engineer <br />$115-176 <br />Graduate Engineer <br />$12a156 <br />Senior Planner <br />$11 a 231 <br />Planner <br />$95-1 tw1 <br />Senior landscape Architect <br />$1 4fr 21 d <br />LandscapBfthitect <br />$130-161 <br />Landscape OHN ner <br />$75.134 <br />Licensed Project Surveyor <br />$1 Ga 141 <br />Graduate Surveyor <br />$125-191 <br />Survey Technician <br />$00-164 <br />Senior Technician <br />$12I1-2116 <br />Technician <br />$05-176 <br />Specialist' <br />$95.226 <br />Practice Expert" <br />$1711-311 <br />Senior Principal <br />$2011-320 <br />Principal <br />$1 d5-2Bd <br />Administr we�cup(,rate Specialists <br />$58-176 <br />N o separate charges will be made for BPS or robotic total stations on Bolton & M enk, Inc. <br />surrey assignments; the cost of this equipment is inctuded in the rates for surrey technicians <br />*SpeciaG3ed role not classified above otherwise, incL graphic design, project communication, <br />funding support, etc. <br />"Highly speaalQed and industry eKpertise unique tc the market or area cif disc line. <br />Exhibit B Page 1 of 1 v2O21O4O7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.