Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br />ARDEN HILLS CITY COUNCIL - SEPTEMBER 11. 1995 <br /> <br />13 <br />, <br /> <br />Mr. Ringwald noted although the plan was not directly endorsed, he felt the presentation went well. <br />He indicated the Task Force hopes to present a resolution that will be endorsed at the next meeting <br />of the Reutilization Committee. <br /> <br />Mayor Probst commended Mr. Ringwald for his presentation at the Reutilization Committee meeting <br />and noted eight of the ten Task Force members were present. <br /> <br />Mayor Probst indicated two plans have been presented, the one from Arden Hills and a plan from <br />the Friends ofTCAAP, he felt the plans were very similar. He noted he hopes the Reutilization will <br />choose a conceptual plan without specifically identifying land use. <br /> <br />Mayor Probst indicated the last two meetings of the Reutilization Committee will be held on October <br />14th and 23rd. <br /> <br />ADMINISTRATOR COMMENTS <br /> <br />City Accountant Post presented the arlministrator comments due to the absence of Mr. Fritsinger. <br /> <br />Mr. Post indicated at the December 28, 1994 Council Meeting, Council authorized Staff to proceed <br />with at $13,856.82 unbudgeted capital item in the Water Fund, this item cousisted of the :first phase <br />of a two phase project. The first phase consisted of replacing the control panels at the booster <br />Station and Femwood (north) water tower. <br /> <br />Mr. Post noted Staff indicated that the second phase of the project, including replacement pumps, <br />motors and the control panel at the Red Fox (south) water tower would be evaluated in 1995. <br /> <br />Public Works Superintendent, Stafford indicated after working with the Roseville Water Department <br />Engineer they have provide the City with information on how to save money using the updated <br />controls and will now be able to fill the south tower for the :first time since it was built. <br /> <br />Mr. Post indicated it is recommended that the Council authorize Connelly Electronics to go ahead <br />with the Telemetry portion of Phase n at the price of about $4,400.00 and eliminate plans for <br />replacing motors, saving approximately $19,000.00 from planned Phase n. <br /> <br />MOTION: <br /> <br />Malone moved, and Hicks seconded a motion to authorize Connelly Electronics to <br />proceed with The Telemetry portion of Phase n at a price not to exceed $4,400.00. <br />The motion carried unanimously (5-0). <br /> <br />COUNCll.. COMMENTS <br /> <br />Councilmember Malone indicated the trail near the City Hall was not opposed by the nearby <br />townhome development, but rather they could not afford the expense. <br />