My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-10-1995
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1995
>
CC 10-10-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:41 PM
Creation date
11/3/2006 2:13:55 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I. ARDEN fiLLS CITY COUNCIL - OCTOBER 10. 1995 7 <br /> I <br /> City Attorney to determine if an appraisal of the property is required, prior to the <br /> I determination of the appropriate park dedication fees. <br /> 9. Compliance with the Shoreland Management Ordinance, in particular Sections <br /> I 20.5-41 and 20.5-47. <br /> The Grading and Erosion Control Plan has been modified such that the outlet of the <br /> sedimentation basin does not outlet into Valentine Lake, but outlets into Valentine <br /> I Creek. Therefore, the Shoreland Management Ordinance no longer applies to this <br /> project. However, the plan still provides for the: preservation of trees; setbacks from <br /> I Valentine Lake; reduced structure heights; and reduced lot coverage. These are <br /> consistent with the requirements of the Shoreland Management Ordinance. <br /> I 10. Modification of the name of the private street. <br /> The name of the private street has been modified to Lake View Court. <br /> I 11. Modification of the Townhouse Association documents, per Staff direction, for <br /> approval by the City Attorney. <br /> .e The City Attorney and Staff are currently reviewing the Townhouse Association <br /> documents for consistency with the previous direction given by Staff and the <br /> Planning Commission. <br /> I 12. Compliance with applicable provisions ofthe City Code. <br /> This is a standardized condition of approval. <br /> I 13. Any required pumping of the storm pond would be the responsibility of the <br /> Townhouse Association. <br /> I The plans have been modified so that the storm water sewer outlet does not outlet <br /> into Valentine Lake. Therefore the flooding potential from Valentine Lake has been <br /> eliminated. However, the responsibility for the maintenance and upkeep of the <br /> I sedimentation basin and the structures should be the responsibility of the <br /> homeowners association. <br /> I 14. A 16.5 foot conservation easement be established and posted around the <br /> delineated wetlands. <br /> I The Preliminary Plat delineates a 16.5 foot conservation easement adjacent to the two <br /> wetland basins. <br /> I 15. Signs denoting "No Parking, by Order ofthe Fire Marshal" be posted on the <br /> private street. <br /> I- The Grading and Erosion Control Plan shows the location of the required signage on <br /> Lake View Court. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.