Laserfiche WebLink
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2024 2028 <br />thru Department Equipment <br /> Description <br />Replace 2020 Bobcat Toolcat #461. <br />Hours 523 <br />Estimated auction return $25,000 <br />Equipment may need to be replaced in 6 years. <br />Project #25-Eqp-004 <br />Priority 2 Very Important <br /> Justification <br />PW currently owns 2 Toolcat's and the primary purpose is snow removal along sidewalks and park trails. During the winter months, the machines <br />are cleaned but salt and the heavy load out on the machine equates to costly repairs and down time. The machine is also used in the summer <br />months on a weekly basis. <br />Equipment repair costs from 2020-2023 total - $4,857 <br /> Budget Impact/Other <br />Time efficiency resulting in labor savings. <br />Useful Life 5 <br />Project Name Replace 2020 Bobcat Toolcat #461 Category Equipment: Public Works <br />Type Equipment <br />TCAAP No <br />Total Project Cost:$140,000 <br />Total2024 2025 2026 2027 2028Expenditures <br />70,00070,000Equip/Vehicles/Furnishings <br />70,000 70,000Total <br />Total2024 2025 2026 2027 2028Funding Sources <br />45,00045,000Equipment/Building <br />Replacement Fund <br />25,00025,000Trade-In Value <br />70,000 70,000Total <br />Produced Using the Plan-It Capital Planning Software <br />14