Laserfiche WebLink
<br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br />ARDEN HILLS CITY COUNCn.. - JULY 11, 1994 <br /> <br />8 <br /> <br />Mr. Solar stated that the other choice would be to allow 10 feet on one side for parking and <br />4 feet on the other side. <br /> <br />Severtson stated that the 10 feet on one side for parking would be preferable because there is <br />a fair amount of pedestrian traffic along that road. Several residents have expressed concern <br />about the fact that County Road E is seen as a four-lane road and pedestrians are not given <br />the right-of-way at all. <br /> <br />Mr. Solar stated that could be done. The only trouble with making a wider shoulder on one <br />side is that there will be drivers who try to use the parking lane as a driving lane. <br /> <br />Hicks noted the two driveways at the intersection ofT.H. Sl and County Road E. Cars <br />could turn left into the first driveway without trouble but not the second one. <br /> <br />Mr. Solar stated that there should be medians at that intersection. If the bridge is rebuilt. <br />there will be a concrete island all the way through. Islands are typically used to protect <br />signalized intersections. <br /> <br />Hicks recommended that this plan be sent to the Public Safety Committee for review. <br /> <br />Mr. Solar stated that he would like to receive direction from Arden Hills for the restriping <br />project. <br /> <br />Malone asked how late in the season striping can be done. <br /> <br />Mr. Solar answered, until late October. The County will have to request that the state <br />approve the work. He would like to see it done by late August or September. <br /> <br />Malone stated that the City can respond after the Public Safety Committee meeting by the <br />first Council meeting in August. <br /> <br />REVIEW OF 1994 PAVEMENT MANAGEMENT Sl.:HIillULE <br /> <br />Winkel referred Councilmembers to the 1994 pavement management schedule in the Council <br />packet. He reported that the work will begin Monday, July 18, 1994, to remove the <br />blacktop from Dunlap and storm sewer work will begin Tuesday, July 19. The Bussard <br />Court reconstruction will start soon after. The Keithson Road cold-in-place recycling and <br />Amble Drive reconstruction projects will begin towards the end of July or the first part of <br />August. NSP will be moving the gas main on Amble Drive, and this work should be <br />completed within a couple of weeks. <br />