Laserfiche WebLink
<br /> I.P. 6284-111 (I-35W) <br /> . (1404) IlAIIfrE1WICE or DAPPIC <br /> Traffic ahall be ..intained in accordance vith the provilionl of Ma/DeT <br /> 1404, Ma/DeT 1710, and the followinl' <br /> .1 Ixc.pt al otharwile provided for in thale lpecial Provilionl, there ahal1 <br /> .. no intarfarance witb traffic .t tbe follovinl ti..1 .nd loc.tionl' <br /> !: .. CD loutbbound I-35W fr~ 6.00 A.M. to ,.00 A.M., Tvelday throulb Friday. <br /> f b. CD loutbbound I-35W fr~ 2.00 P.M. Sunday to ,.00 A.M. Monday. <br /> c. On nortbbound I-35W fr~ 2.30 P.M. to 6,30 P.M., Monday tbroulh Thurlday. <br /> d. On northbound I-35W fr~ 2.30 P.M. Frid.y to 6.00 A.M. Saturday. <br /> .2 The Contractor aay r.ltrict traffic to . linll. lane .t the followinl <br /> timel .nd locationl. <br /> .. On louthbound I-35W fr~ 8.00 P.M. to 5.00 A.M., Monday tbroulh Saturday. <br /> b. CD northbound I-35W from 10.00 P.M. to 7.00 A.M., Saturday through <br /> Thurlday. <br /> .1' .3 <br /> At .11 other houri not lilted in 1404.1 and 1404.2 .bove, tbe Contr.ctor <br /> Ib.ll ..intain . .ini.um of two lanel of tr.ffic in .ach direction on <br /> I-35W. <br /> .4 The Department relerves the rilht to lengthen, Ihorten, Dr otherwile modify <br /> these time restrictions or to impole other reltrictions as may be necessary <br /> to lafely provide for traffic. Temporary lane clolures by the Contrsctor, <br /> . during work hours and conliltent with the.e ti.e re.trictions, viiI be <br /> permitted at tho.e location. approved by the Enlineer. Reque.t. to ..ke <br /> temporary lane clo.ur.1 Ihall be made at lealt 24 hour. prior to auch <br /> clolure.. <br /> .5 The Contractor Ihall proceed vith hi. con.truction operations 10 as to <br /> msintain traffic in a ..nner and lequence a. Ihown in the Traffic Control <br /> .heetl in the Planl, and aa let forth in thele Special Provi.ion., except <br /> .1 otherwile luthori&ed in vritinl by the Inlineer. The Contractor Ihall <br /> .ubmit to the Inlineer, for approval, layout I li.ilar to the appropriate <br /> Iheetl of the Planl, Ihovinl .ny propoled chanae of traffic maintenance. <br /> The.e layout. Ihall Ihow a complete lequence from the point of chanae <br /> through the completion of the Project. <br /> .6 Belinninl on Tuelday, July 7, 1987, .t 10.00 A.M., the Contractor Ihall <br /> clo.e the riaht and center lanel of louthbound I-35W to traffic from approxi- <br /> aately 2300 f..t louth of County Ro.d I to 1-694 .nd he aay, at the lame <br /> tlM or 1.tar. elol. the rilbt and e.nt.r Ian. I of louthbound X-35W fr~ <br /> .ppro.~ta1y 1600 feat 80uth of County load 1-2 to County Ro.d C in th. <br /> . _ar .. lhown Sa tIIa Plal without nl.... to ay tlM raltrletionl of <br /> 1404.1, 1404.2, 1404.S, ad 1404.4 .boYa. <br /> ~ <br /> . <br /> ~ <br /> ------------ <br />