My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-23-1987
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1980-1989
>
1987
>
CCP 02-23-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:52 PM
Creation date
11/3/2006 2:41:39 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> < <br /> " <br /> 6. ITEM <br /> . Public ditches preserved as open channels (Page V-22). <br /> PROBLEM <br /> Open channels are desirable from the standpoint of water storage, <br /> groundwater discharge, and treatment. However, in some unchanged areas, <br /> retaining ditches as open channels will be impractical and uneconomical <br /> for development and detremental to the health safety and welfare of the <br /> community. <br /> CITY POSITION <br /> That the Rice Creek Watershed District plan proVide for the replacement of <br /> open channel ditches with enclosed drainage system where conditions <br /> warrant. <br /> . <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.