My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-09-1987
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1980-1989
>
1987
>
CCP 03-09-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:53 PM
Creation date
11/3/2006 2:41:42 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ( <br /> r r <br /> Any filling below the established IOO-year floodplain elevation for the <br /> site is prohibited unless compensatory storage is provided. Also, <br /> minimum building opening elevations must be at least two feet above the <br /> established IOO-year floodplain elevation. <br /> - Easements will be required over all areas on the property SO feet either <br /> side of the centerline of any officially established county or judicial <br /> ditch, and in areas with elevations less than the established IOO-year <br /> floodplain elevation. <br /> - A stormwater man~gement plan fOr this site must address stormwater <br /> management for all contiguous properties owned by the applicant. <br /> - Because this site contains wetlands, permit approval may also be required <br /> from the DNR and the Corps of Engineers. <br /> - The District will also require that any grading or filling not alter the <br /> existing drainage patterns through the site. <br /> - The District will require calculations showing that the hydraulic capacity <br /> of the d itch wi 11 not be a ltered and cross i ngs will not impede the fl ow. <br /> - A building setback of feet must be provided from the NOHW for the <br /> adjacent water body. ---- <br /> - Preparation of a sediment-erosion control plan will be necessary which <br /> will retain all sediment on site. This plan must also include an <br /> implementation schedule for erosion control measures including notes <br /> addressing the establishment of temporary or permanent vegetative cover <br />. after the completion of grading. <br /> - <br /> The Board of Managers meets regularly on the fourth Wednesday of each month to <br /> act on permit applications. All information must be submitted thirteen (13) <br /> calendar days prior to the meeting date in order for the submittal to be <br /> considered at the meeting. <br /> Please be advised that no construction operations are authorized without <br /> permit approval from the Rice Creek Watershed District. <br /> If you have any questions, please, contact us at 473-4224. <br /> Very truly yours, <br /> EUGENE A. HICKOK AND ASSOCIATES <br /> Engineers for the District <br /> flC.~ <br />. John C. Panuska, Civil Engineer <br /> cc: Boa rd 0 f Ma na gers F. Murray <br /> Dis tri ct Offi ce City of A~D~ H111 ~ <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.