My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
02-12-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 4:25:01 PM
Creation date
2/8/2024 4:11:02 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey County Department of Public Works <br />1425 Paul Kirkwold Drive <br />Arden Hills, MN 55112 <br />Contractor: <br />Bituminous Roadways, Inc. <br />Project Location: <br />County Rd. E and Old Snelling Ave. <br />The Contract is amended as follows: <br />CHANGE ORDER 5 <br />Contractor's Address: <br />1520 Commerce Dr. <br />Mendota Heights, MN 55120 <br />Project Description: <br />Road Reconstruction <br />SUPPLEMENTAL TO <br />CONTRACT CCO03151 <br />Attachment A <br />State Aid Project No. <br />S.A.P.062-676-006 <br />Account No. <br />P - 3420 <br />Sheets 27 and 33 of the MVHS Trail project calls the casting and rings to be removed & replaced for the existing sanitary manhole <br />at Sta 22+60 to match the new trail elevation. Upon review in the field, the existing structure did not have adjusting rings, so the <br />casting could not be lowered without reconstructing the structure. The Engineer directed the Contractor to reconstruct the sanitary <br />manhole in order to lower the casting to the correct finished grade elevation. The Engineer and Contractor agreed upon the <br />negotiated unit price as shown below in the Estimate of Costs. <br />Contract time will not be revised except as may be provided under that Contract provisions of MN/DOT Specification 1806. <br />The Contractor shall not make any claim of any kind or character whatsoever for any other costs or expenses which he may have <br />incurred of which he may hereafter incur in performing the work and furnishing the materials required by this agreement. <br />ESTIMATE OF COSTS <br />Item No. <br />Item <br />Unit Unit Price Quanti Amount <br />1402.5 <br />Reconstruct Sanitary Manhole <br />Each $7,150.00 1 $7,150.00 <br />Net Total Change: $7,150.00 <br />S.A.P 187-108-004 (100% <br />City of Arden Hills) <br />1-5-23 PAUL HILDESTA aK mom` <br />Date <br />Approved By <br />Date Approved By <br />County Project Engineer <br />Contractor <br />Date <br />Approved By <br />Date Accepted By <br />County Engineer <br />Assist. D.E. State Aid Metro <br />Date <br />Funds are Available <br />Date Approved By <br />County Manager <br />City of Arden Hills <br />�igAally signatl by Dan Hermg <br />Dan H e rzo 1-N D2024.0 0 e130 04rt06•g0,liingcom <br />Date <br />Approved By Chair, Ramsey <br />Date Approved By <br />County Finance <br />SRF Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.