Laserfiche WebLink
inside core drilled, interior pipe seal used and outside annual space of drilling mud <br />replaced with stabile material. <br />3. It appears curb tie-in will extend into the county Right -of -Way. A RO Permit will be <br />needed prior to beginning construction. <br />In the following attachments to this memo will be the comments made within the plan and report <br />sheets from the 01/17/24 email submittal. Only plan and report sheets with applicable <br />comments are included as part of this memo. <br />