My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
02-12-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 4:25:01 PM
Creation date
2/8/2024 4:11:02 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />12. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. <br />13. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />14. A separate zoning permit shall be required for a new fence on the site. <br />15. A separate sign permit shall be required for all signs on the site. <br />16. Any future trash and vacuum enclosures shall utilize gates and be constructed on three <br />sides using the same materials and patterns used on the building. Locations shall be <br />approved by the Planning Department. <br />17. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be memorialized in the Development Agreement. <br />18. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br />shall be sodded or seeded and maintained. The property owner shall mow and maintain <br />all site boulevards to the curb line of the public streets. <br />19. The proposed structures shall conform to all other regulations in the City Code. <br />20. The Applicant shall provide a copy of the Stormwater Management Report and verification <br />of Rice Creek Watershed approval prior to the approval of Development Agreement. <br />21. The Applicant shall provide a diagram of the 19 parking spaces provided for the site <br />through the Reciprocal Easement Agreement. <br />22. Prior to the issuance of a grading permit, all items identified in the February 12, 2024 <br />Engineering Division memo including the review comments noted on the plan sheets shall <br />be addressed. All comments shall be adopted herein by reference. <br />23. Applicant shall be responsible for addressing Ramsey County review comments as noted <br />in the February 12, 2024 report to the City Council. <br />PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS <br />THIS 12th DAY OF FEBRUARY, 2024. <br />David Grant, Mayor <br />ATTEST: <br />Julie Hanson, City Clerk <br />To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting <br />cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.