Laserfiche WebLink
<br /> . -, ~ . h )(H//~ // ~ <br /> . <br /> ',:. <br /> wehrman <br /> . bergly <br /> TIQQDat~ <br /> August 6, 1987 <br /> . n. plaza bldg., S1e, 220 <br /> G.P.-Gagr, Inc. 5217 wayzllla blvd, <br /> miMeapoflS, I'M 55416 <br /> c/o Bertin Bisbee 612 S44 7576 <br /> Fredrickson and Byron <br /> 1100 International Centre <br /> 900 Second ,Avenue South <br /> Minneapolis, Minnesota 55402 <br /> Re; Daybridge learning Center <br /> Arden Hi 11 s, MN <br /> Mr. Bisbee: <br /> I have briefly reviewed the attached preliminary site plan for the <br /> Daybridge Learning Center submitted to me by Randy Pederson. I have <br /> concluded that the site plan, as drawn, conforms to all setback, site <br /> coverage, access, and, parking requirements ~f the ordinance. Before <br /> final approval of the site plan can be given, however, additional <br /> documentation required by Section VIII,E(l) of the Zoning Code must be <br /> . submitted. This documentation must include a more detailed, dimensioned <br /> site plan; a grading and drainage plan; a landscape and lighting plan; <br /> and building plans and elevations. Provided that these items are <br /> consistent with the plans originally approved by the City for the east <br /> site, I do not anticipate any problems in the process of administrative <br /> approval. <br /> Sincerely, <br /> '~EHRMAN BERGLY ASSOCIATES, INC. <br /> Orlyn W, t,1i11er <br /> Consultant Planner for City of Arden Hills <br /> Enclosure <br /> cc: James A, Stolpestad <br /> Doherty Rumble and Butler <br /> 1500 East First National Bank Bldg. <br /> St. Paul, Minnesota 55101 . <br /> . <br /> , <br /> . <br /> planning . Iandsc;aP8 architecture <br />