Laserfiche WebLink
<br /> .. <br />. <br /> VILLAGE OF SHOREVIEW <br />. RAMSEY COUNTY, MINNESOTA <br /> 4665 NORTH VICTORIA STREET <br /> Shoreview, Minnesota 55126. Telephone 484-3353 <br /> December 18, 1989 <br /> Mr. Gary Berger <br /> City Administrator <br /> City of Arden Hills <br /> 1450 West Highway 96 <br /> Arden Hills, MN 55112 <br /> RE: SHOREVIEW / ARDEN HILLS WATER SYSTEM INTERCONNECTION <br /> CITY PROJECT 89-25 <br /> Dear Gary: <br /> Attached is a change order for the water system interconnection <br /> between Arden Hills and Shoreview at the Grey Fox Road - <br /> Lexington Avenue intersection. The change order is for the <br /> installation of a fire hydrant and gate valve that was <br /> necessary for the proper operation and maintenance of the <br /> in terconnect ion. The change order also includes a credit for the <br /> substituting of a wet tap into the 12-inch main on the Arden <br /> Hills side of Lexington Avenue in lieu of a tee that was <br />. originally proposed for installation. The tee could not be <br /> installed due to the high number of users on the Arden Hills <br /> system and the lack of valves to isola te these users. <br /> The breakdown on costs is as follows: <br /> ITEM ARDEN HILLS SHOREVIEW <br /> vIET TAP $ (320.00) $ 0.00 <br /> HYDRANT, VALVE $1,161.50 $1,161. 50 <br /> TOTAL $ 841. 50 $1,161. 50 <br /> It is requested that you review this item with your City <br /> Council. The work has been completed as part of the proj ecL <br /> The contractor was authorized to proceed with the work because <br /> the changes were necessary to implement the interconnection. <br /> If the change order is acceptable, please notify me so that <br /> the final payment to the contractor can be made. If there are <br /> additional questions, please contact me. A final invoice <br /> for the interconnection construction will be forwarded within the <br /> next few weeks. <br />. CJT(]k:li~ <br /> \ .... \.. I <br /> R. Charles Ahl, P.E. <br /> Director of Publ ic Works <br />