My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-09-1990
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1990
>
CCP 04-09-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:15 PM
Creation date
11/3/2006 3:30:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
View images
View plain text
<br />A~ Delta <br /> <br />Environmental <br />. W~ Consultants, Inc. <br /> <br />1801 Highway 8, Suite 114 <br />St. Paul, MN 55112 <br />612/636-2427 <br />FAX:612/636-8552 <br /> <br /> <br /> <br />April 6, 1990 <br /> <br /> <br /> <br />Mr. Gary R. Berger <br />Village of Arden Hills <br />1450 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Subject: KEM Milling Site Demolition <br />Arden Hills, Minnesota <br />Delta No. 10-89-385 <br /> <br />Dear Mr. Berger: <br /> <br />The bid tabulations for the underground storage tank removal and well abandonment projects are <br />enclosed with this letter (fables 1 and 2). Also, references requested by Delta Environmental <br />. Consulta.nts, Inc (Delta), (fable 3 and 4) from the lowest bidder for each project are included for <br />your rCV1ew. <br /> <br />Delta has attempted to contact the references provided by the low bid contractors (fable 3 and <br />4). Three references were contacted regarding Bergerson-Caswell Drilling, Inc., the low bidder <br />on the well abandonments. Only two references regarding HRS Construction, Inc, the low bidder <br />for the underground storage tanks were contacted. However, it is our understanding that HRS <br />Construction, Inc. references provided to the city of Arden Hills for the general demolition <br />contract were excellent. <br /> <br />Based upon our review of the bid packages and the references contacted, it is our recommendation <br />that Bergerson-Caswell, Inc. be awarded the KEM Milling well abandonment contract. It is also <br />our recommendation that HRS Construction, Inc. be awarded the KEM Milling UST removal <br />contract. <br /> <br />Delta appreciates the opportunity to review the bid packages for the KEM Milling site demolition <br />for the city of Arden Hills. The bid packages from all contractors were worthy and we suggest <br />the city prepare a letter thanking each of the bidders for their participation. <br /> <br /> <br /> <br /> <br /> <br /> <br />. <br /> <br /> <br /> <br />Practical Solutions to Environmental Concerns <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).