My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-09-1990
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1990
>
CCP 04-09-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:15 PM
Creation date
11/3/2006 3:30:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> TABLE 2 <br /> . BID TABULATION FOR WELL ABANDONMENTS <br /> KEM MILliNG SITE <br /> DELTA NO. 10-89-385 <br /> The bid tabulation for the abandonment of four water supply wells at the KEM Milling Facility is as follows: <br /> Comoanv Name Lumo Sum Base Bid Time and Materials2 <br /> HRS Construction, Inc. S 26,000.00 - . 3 <br /> McCarthy Well Company S 20,403.80 S122/hour <br /> RH. Renner & Sons, Inc. S 13,745.00 S149/hour <br /> Bergerson-Caswell, Inc. S 12,760.00 S138/hour <br /> 2 Time and materials based on total hourly rate for driller, driller's helper, and pump rig. <br /> 3 Bid proposal did not include fee schedule or drilling license. <br /> . <br /> . <br /> --------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.