Laserfiche WebLink
<br /> ---.--------- <br /> CITY OF ARDEN HILLS <br /> APRIL 4, 1990 . <br /> PAGE TWO <br /> 6. The estimated cost of these proposed improvements to the City of Arden <br /> Hills is $86,388.20. This cost breaks down as follows: <br /> 0 75% of the Cost of Concrete Curb & Gutter $35,415.00 <br /> 0 No cost for the traffic lanes - 0 - <br /> 0 No cost for storm sewer - 0 - <br /> 0 100% of the cost of the West Side Pathway 35,395.00 <br /> 0 No cost for the East Side Pathway - 0 - <br /> 0 10% of the local construction cost for <br /> preliminary engineering 7,081.00 <br /> 0 12% of the 1 oca 1 construction cost for <br /> construction engineering :8,497.00 <br /> TOTAL $86,388.20 <br /> The lack of a local storm sewer cost assumes the Office of State Aid <br /> will determine that the proposed storm sewer construction is 100% <br /> fundable with CSAH monies. Any portion determined to not be fundable <br /> will be charged to the cities of Arden Hills and Shoreview based on <br /> tributary areas. . <br /> Elimination of the west side pathway would reduce the City's estimated <br /> cost by $43,181.90. <br /> 7. With the exception of whether or not to include the west side pathway, <br /> I believe the plans are acceptable and can be approved by the City <br /> Counci 1. <br /> If you have any questions regarding these comments, please call. <br /> Sincerely, <br /> MAIER STEWART AND ASSOCIATES, INC. <br /> /i?t~///I/zcvuc <br /> Terry J. Maurer, P.E. <br /> T JM/ km <br /> . <br /> -------.-- <br />