My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-19-1990
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1990
>
CCP 03-19-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:20 PM
Creation date
11/3/2006 3:30:52 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> r-"-v n ARCEi',J HILi~S <br /> v_ , .~ <br /> "I ii, P " 1990 <br /> . .,;K,I ' , <br /> J . ~ ~ E GHT <br /> The two street improvement programs are shown by Exhibit 3. Note that <br /> trle total estimated project cost for beth the 1990 and 1991 programs exceed <br /> 5100,000. We anticipate that bids for the work could come in slightly lower <br /> given a good bidding environment. We have set up the programs in <br /> anticipation of completing as many streets as possible. However, if bids <br /> received exceed the project budget, streets may be deleted until the project <br /> is within budget. From an administrative standpoint, it is easier to set up <br /> a program and scale it down than to set up a small program and add streets <br /> after bids are received. <br /> You will also note that the preliminary 1991 seal coating program <br /> . ~~c:uces two s:r2~:S, 8eckman Avenue end L3ke Lcnet which are scmewhat <br /> separated from the rest of the streets to be seal coated. The area <br /> surrounding these two streets was included in the 1988 program. However, <br /> these two streets, which also are rated in need of seal coating, were <br /> omitted. Since many other areas also need seal coating, seal coating will <br /> likely not occur again in this area for five to seven years. Beckman Avenue <br /> ~ <br /> and Lake Lane should be seal coated long before then however, so they have <br /> been included for 1991. <br /> It is important to note that no streets rated in the Study as needing <br /> reconstruction are included in the 1990 or 1991 street improvement programs, <br /> These streets are not included since an annual budget of $100,000 is not <br /> sufficient to address reconstruction needs. The Study currently estimates <br /> . reconstruction needs of nearly 5970,000. A re-rating of the City streets <br /> would certainly increase this estimate to well over $1,000.000, <br />
The URL can be used to link to this page
Your browser does not support the video tag.