Laserfiche WebLink
<br /> - <br /> . <br /> """'~.,,:,;. 00"'""'" '"'''''' <br /> Maier Stewart & Associates Inc. <br /> July 17, 1990 <br /> Fil e: 520-013-30 <br /> Mr. Bob Korf, President <br /> HRS Construction, Inc. <br /> 23605 County Road 10 <br /> Loretto, MN 55357 <br /> RE: KEM MILLING DEMOLITION - ARDEN HILLS <br /> (520-013-30) <br /> Dear Mr. Korf: <br /> We are in receipt of your faxed billing statements dated July 6, 1990. <br /> With regard to your request for an extra for $2,527.50 to break up silo <br /> . slabs, we cannot recommend payment for this extra for the following: <br /> 1) Per the specifications, you were required to make a complete site <br /> inspection prior to bidding to determine if the floor slabs in the <br /> silos existed. <br /> 2) Per the specifications, you were required to only break up the <br /> slabs in place and backfill. If you chose to do additional work, <br /> you did so at your own cost. <br /> 3) Authorization for extra work is required prior to doing the work. <br /> By performing the work before authorization, you have denied the <br /> City any options to consider to avoid or reduce down the cost of <br /> the extra. <br /> We will begin to process your final payment for the July 30. 1990 regular <br /> City Council meeting pending receipt of the following: <br /> 1) As built information shown on the attached drawing showing what <br /> foundations two feet below grade and surface slabs have been left <br /> in place <br /> 2) Lien waivers from all subcontractors <br /> 3) Removal of all equipment and debris from the site - you have two <br /> . trailers, two blue tanks and an I-beam left on site <br /> 4) Knock down foundation for scale two feet below grade <br /> 1959 SLOAN PLACE. ST. PAUL. MINNESOTA 55117 612-774-6021 Equal Opportunity Employer <br />