Laserfiche WebLink
<br /> . <br /> . <br /> . <br /> SUMMARY <br /> --------------- <br /> DESCRIPTION TOTALIPERIOD TOTAL/TODATE <br /> SCHEDULE 1.0 SITE DEMOLITION- $3,440.00 $65,360.00 <br /> 1 THIS PERIOD 1 TOTAL TO OATE I <br /> ------------------1------------------1------------------I <br /> AMOUNT EARNED I $3,440.00 1 $65,360.00 1 <br /> -------------------1------------------1------------------I <br /> . AMOUNT RETAINED I $0.00 1 $3.440.00 1 <br /> ------------------1------------------1------------------I <br /> MATERIAL ON SITE I $0.00 I $0.00 I <br /> ------------------1------------------1------------------I <br /> MATERIAL DEDUCT. 1 $0.00 I $0.00 1 <br /> ------------------1------------------1------------------I <br /> PREVIOUS PAYMENTS 1******************1 $58,480.00 1 <br /> ------------------1------------------1------------------I <br /> AMOUNT DUE 1 $3,440.00 I $3,440.00 I <br /> ------------------1------------------1------------------I <br /> . <br />