Laserfiche WebLink
<br /> . . <br />Minutes of the Arden Hills Regular Council Meeting, 9-10-90 <br />Page 4 <br />POND (Cont'd) Attorney Filla recalled the pond is to be pumped dry, the . <br /> bottom elevation should be determined at that t:i1ne and <br />compared to the elevation on the original design specifications; the Engineer <br />will then review and determine hCM IllUch capacity can be obtained by excavating to <br />the proper depth. <br />council con=ed to direct staff to inform the developer and residents that the <br />pond should be constructed to original design specifications and capacity and <br />that may include removal of the "point" discussed. <br />Attorney Filla advised the Keitbson pond must be constructed as represented, to <br />insure that other developments will be constructed as per plans approved. <br />Council questioned if there has been any further discussion with residents <br />regarding civil action against the city. <br />Clerk Administrator Berger stated one of the residents has expressed concern <br />regarding loss of trees and mentioned possible civil action. <br />ADJOURN Hansen moved, seconded by Malone, that the meeting be <br /> adjourned at 8:20 p.m. Motion =ied unanimously. (4-0) <br /> . <br /> -- <br />Gary R. Berger ThamasR.Sather <br />Clerk Administrator Mayor <br />NOITCE OF MEErlliGS <br />There will be a meeting to discuss the Public Works supervisor annual evaluation <br />held on Monday, September 24, at 6:30 p.m., at city Hall. <br />The next Regular Council Meeting will be held on Monday, September 24, at 7: 30 <br />p.m., at city Hall. <br /> . <br />