My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-13-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 01-13-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:44 PM
Creation date
11/3/2006 3:53:20 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> ~ pond level of 946.5 under current conditions will not require any grading of the <br /> pond. <br /> I <br /> I Under future developed conditions, pond A-7a must have a storage volume that <br /> will hold the runoff from the entire drainage area (A-7) while allowing a peak <br /> I discharge out of the pond of 4.8 cfs. With these criteria, pond A-7a requires <br /> 1.95 acre-feet of storage for the 100 year 24 hour storm and will have a <br /> I maximum pond height of elevation 947.3. The upper channel in the northwest <br /> I corner of pond A-7a must be filled in and replaced with a 15" RCP pipe with <br /> an invert elevation of 945.3. An orifice plate with a 13" diameter opening is <br /> I required to reduce the flow out of the pond to 4.8 cfs. The pond must also be <br /> graded to contain water up to an elevation of 947.3. However. construction of <br /> I the 15" RCP storm sewer and orifice plate could be completed when the entire <br /> . drainage area of 16.67 acres is developed. <br /> I The Rice Creek Watershed District is requiring that the baffled weir for <br /> pond A-7A be constructed when the 24" RC pipe is installed into the pond. <br /> I The weir in pond A-7a is designed with the same requirements as the weir serving <br /> I the wetland preservation area. This weir will treat the 1 year 24 hour storm <br /> water runoff for the entire drainage area of 16.67 acres. The top of the weir <br /> I will be at elevation 946.10 and requires a minimum length of weir of 24 linear <br /> feet. Page 4 of the plans illustrates the details of the weir at pond A-7a and <br /> I its location. The installation of the weir will require grading the channel <br /> I side and bottom. The bottom of the channel under the weir should be at <br /> elevation 944.7. <br /> I <br /> f <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.