Laserfiche WebLink
<br /> pond level of 946.5 under current conditions will not require any grading of the <br /> . pond. <br /> Under future developed conditions, pond A-7a must have a storage volume that <br /> will hold the runoff from the entire drainage area (A-7) while allowing a peak <br /> discharge out of the pond of 4.8 cfs. With these criteria. pond A-7a requires <br /> 1.95 acre-feet of storage for the 100 year 24 hour storm and will have a <br /> maximum pond height of elevation 947.3. The upper channel in the northwest <br /> corner of pond A-7a must be filled in and re~laced with a 15" RCP pipe with <br /> an invert elevation of 945.3. An orifice plate with a 13" diameter opening is <br /> required to reduce the flow out of the pond to 4.8 cfs. The pond must also be <br /> graded to contain water up to an elevation of 947.3. However, construction of <br /> the 15" RCP storm sewer and orifice plate could be completed when the entire <br /> . drainage area of 16.67 acres is developed. <br /> The Rice Creek Watershed District is requiring that the baffled weir for <br /> pond A-7A be constructed when the 24" RC pipe is installed into the pond. <br /> The weir in pond A-7a is designed with the same requirements as the weir serving <br /> the wetland preservation area. This weir will treat the 1 year 24 hour storm <br /> water runoff for the entire drainage area of 16.67 acres. The top of the weir <br /> will be at elevation 946.10 and requires a minimum length of weir of 24 linear <br /> feet. Page 4 of the plans illustrates the details of the weir at pond A-7a and <br /> its location. The installation of the weir will require grading the channel <br /> side and bottom. The bottom of the channel under the weir should be at <br /> elevation 944.7. <br /> . <br />