My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-10-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 02-10-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:46 PM
Creation date
11/3/2006 3:53:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CITY OF ARDEN HILLS <br /> . MEXm\NOOM <br /> Dl\TE: February 51 1992 <br /> TO: Mayor and city Council <br /> FRCM: Dan w:illkell Public works SUperintendent ~ <br /> SUBJECT: Condition of West Round Lake Road - F.Y.I. <br /> I am writing this memorandum to inform the Council about the tremendous <br /> pothole problem that we have on West Round Lake Boulevard. It appears <br /> that the changing weather and poor existing road =nditions have <br /> combined to =eate a real hazard to drive on. We have spent JOClSt of <br /> this week trying to patch potholes 1 and open frozen culverts on this <br /> road. <br /> On Wednesday, I had New Brighton come over with the lIlOtor grader to <br /> assist with ice removal and also level off gravel that was put in place <br /> to fill the potholes. We have alxlve six blocks of roadway that has <br /> deteriorated to the point of being beyond repair. We hauled in recycled <br /> gravel to place over the existing roadway to Irake it passable for <br /> . traffic. <br /> On Tuesday, I had Terry Maurer and March Graham review the roadway. We <br /> will be re-evaluating our roads for the pavement management program this <br /> spring and I suspect that West Round Lake Road will be at the top of the <br /> list for reconstruction. <br /> I do feel that we have enough interest from the businesses on the <br /> roadway that we may want to try to reconstruct this year if possible. <br /> The existing roadway will no be able to wait until the entire area is <br /> developed to be rebJilt. <br /> I would urge the Council to start the process for possible <br /> reconstruction of this road as soon as possible. <br /> rM/ts <br /> M92-41 <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.