Attachment C <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR <br />FOR CONSTRUCTION CONTRACT <br />THIS AGREEMENT is made this 8th day of April, 2024 (hereinafter "Effective Date of the Contract") by and <br />between the City of Arden Hills, Ramsey County, Minnesota (hereinafter "Owner") and HYDRO-KLEAN, <br />LLC (hereinafter "Contractor"). The Owner and Contractor hereby agree as follows: <br />ARTICLE 1 — THE WORK AND THE PROJECT <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work <br />is generally described as follows: Cleaning and televising of sanitary sewers, 8" Sanitary Sewer <br />CIPP (Cured -in -Place -Pipe) Rehabilitation, Open -Cut Sanitary Sewer Pipe Repair, Lateral <br />Connection Sealing <br />1.02 The Project, of which the Work under the Contract Documents is a part is generally described as <br />follows: 2024 CIPP Lining, City Project No. PW-23-0101. <br />ARTICLE 2 — CONTRACT DOCUMENTS <br />2.01 The Contract Documents consist of the following: <br />A. This Agreement <br />B. Performance and Payment Bonds <br />C. Insurance Certificates <br />D. Instructions to Bidders <br />E. General Conditions <br />F. Supplementary Conditions <br />G. Division 1 — General Requirements <br />H. Division 2 — Sanitary Sewer Rehabilitation Special Provisions <br />I. Drawings (not attached by incorporated by reference) consisting of 4 sheets with each <br />sheet bearing the following general title: 2024 CIPP LINING, dated 2/7/2024. <br />J. Addenda (Number 1) <br />K. Exhibits to the Agreement <br />1. Contractor's Bid <br />2. Non -Collusion Affidavit <br />3. Responsible Contractor Verification and Certification of Compliance Form <br />L. The following which may be delivered or issued on or after the Effective Date of the <br />Contract and are not attached hereto: <br />1. Notice to Proceed <br />2. Work Change Directives <br />3. Change Orders <br />4. Field Orders <br />2.02 This instrument, together with the documents hereinabove mentioned, form the Agreement, and <br />they are as fully a part of the Agreement as if hereto attached or herein repeated. <br />2.03 The Contract Documents may only be amended, modified, or supplemented as provided in the <br />General Conditions and Supplemental Conditions. <br />ARTICLE 3 — CONTRACT TIMES <br />3.01 Contract Times: Milestone 1, defined as all open -cut project work requiring a construction trench <br />as indicated in the Plans, including removals, excavation and backfilling, utilities, turf establishment, <br />street restoration including aggregate base construction, street paving, driveway paving, and <br />concrete curb, shall be fully completed by September 27, 2024. The Contractor is to substantially <br />complete construction of the project no later than December 20, 2024 in accordance with <br />Paragraph 15.03 of the General Conditions. Substantial completion is defined as the completion of <br />2024 CIPP Lining AGREEMENT <br />PW-23-0101 1 of 5 <br />