My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-11-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 05-11-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:52 PM
Creation date
11/6/2006 2:38:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. CONCLUSION <br /> Based on estimated project costs, the expected service life that a cold in-place recycled and <br /> overlaid street would provide, and discussions with Public Works Maintenance Staff, Option 3 is <br /> recommended as the best alternative for the City of Arden Hills. This option will provide a <br /> roadway that serves the properties using the roadway for a period of 12 to 20 years or until such <br /> time that further development justifies reconstruction of the roadway. This CIR project would not <br /> address subgrade soils conditions, as the cost of the project would be significantly increased. The <br /> proposed improvements are feasible from an engineering standpoint and would meet all standards <br /> set forth by the City. <br />. <br />,-. .~ <br /> - <br />. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.