My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-13-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 07-13-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:54 PM
Creation date
11/6/2006 2:39:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> '"' <br /> . CITY OF ARDEN HILLS <br /> ~ <br /> DM'E: .JUly 9, 1992 <br /> TO: Mayor and city Council <br /> FRCM: Dan Winkel, Public Works superintendent ~ <br /> SUBJECr: Public Works Weekly Report <br /> This week, the Public Works crew read residential water meters and carrg:Jleted <br /> the task on 'I\1esday. Repairs to the meters will be carrg:Jleted in two weeks. <br /> 'll1e jetter truck was used to clean the area north of I -694 and will be <br /> conplet€d next week. 'll1e entire southern area of town was carrg:Jleted last <br /> year. <br /> This week, two members of the crew were out on vacation and one member was out <br /> due to illness. <br /> On Monday and 'I\1esday, the water level at Keithson Pond was lowered. 'll1e <br /> rains received last week raised the pond to a fairly high level. <br /> . The Tiller Lane reconstruction project is moving along very well. The suJ::cut <br /> portion of the job will be conplete this week. CUrb and gutter work will <br /> begin on Friday or possibly on Monday of next week. <br /> Mark Graham and I met with representatives from New Brighton and both <br /> rerilering plants in New Brighton. Apparently, a storm sewer line originates <br /> at the old rendering plant site in Arden Hills, that runs into New Brighton <br /> and enq;Jties into I.Dng Lake, has deteri=ated at the SUburban L.P. Gas site and <br /> is causing major damage to their facility. 'll1e Merilelkoch Co. is the main <br /> user of this storm sewer, rot because the line originates in Arden Hills, <br /> Merilelkoch 're::ruested Arden Hills to participate in the repairs to the <br /> facilities at SUburban Gas. We told Mendelkoch co. we believe the line is not <br /> =ently used by anyone in Arden Hills and the City would not be interested <br /> in paying for repair work on the line. 'll1e City may have to abandon and fill <br /> the line on our side of 1-35W to guarantee the line is not in use by anyone <br /> else. 'll1e only question that rerrains is the possible use by S.T.S. steel Co. <br /> (this is the old Minnesota Diversified Building) . We will keep you posted as <br /> to our findings. <br /> If the Council should have any questions or =ncerns, please =ntact me. <br /> OO/ts <br /> ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.