Laserfiche WebLink
<br /> .- <br /> . <br /> . <br /> . AEC ENGINEERING ENGINEERS <br /> INSPECTORS <br /> 511 Eleventh Avenue South <br /> Minneapolis, Minnesota 55415 <br /> Phone: 16121332-8905 r,::---.---....'.. <br /> ~ rn ~ II: II ~\:'i ,: <br /> Fax: (612) 334..3101 D '''\.27'''''''1 <br /> r--~~. .,,, <br /> August 17, 1992 'Ij! <br /> I~ L'H '~--j~i <br /> Ms. Patricia A Arlig, P.E. L- --_..J <br /> MSA <br /> 9800 Shelard Parkway, Suite 102 <br /> Minneapolis, MN 55441 <br /> Re: Proposal to Inspect a 500 MG Hydropillar <br /> City of Arden Hills, Minnesota <br /> AEC Proposal #MN062992 <br /> Dear Ms. Arlig: <br /> We are pleased to submit this proposal to inspect the 500 M G Hydropillar for the City of <br /> Arden Hills. Minnesota in the Fall 1992. <br /> The inspection will be performed in conformance with the applicable sections of the enclosed <br /> . Procedures For Insoectina Existina Steel Water Storaae Tanks. Please note that the owner is <br /> to provide an operator to control the flow rate from the reservoir. This person must be at the <br /> control station full time while our inspectors are inside the reservoir. This is a safety <br /> precaution so that in an emergency, the flow from the reservoir can be stopped immediately. <br /> The interior will be examined by one or two individuals floating in a raft while the reservoir is <br /> being emptied. This evaluation can only be performed if the temperatures are above freezing <br /> and there is no ice in the reservoir. <br /> The exterior will be examined in areas accessible without any rigging or scaffolding. Paint <br /> chips from the exterior coating will be analyzed for total lead content. Based on the results, <br /> we may recommend a TCLP Test be performed on a sand blasted sample to determine if <br /> removal of the exterior coating will generate hazardous waste. <br /> Following the inspection, we will submit an Inspection Report, certified by a professional <br /> engineer. The report will include color photographs of the conditions discovered during the <br /> inspection, engineering analysis, and cost estimates of any reconditioning work required. The <br /> report will also include necessary repair procedures for an existing leak, Two copies of the <br /> report will be provided. <br /> The reservoir inspection will be done for a fixed fee of $2.000.00, including the certified <br /> Inspection Report and initial paint chip test for lead. If the inspection cannot be completed in <br /> one day, each additional day will be charged at $850.00. <br /> The inspection fee does not include the cost of the TCLP Test. AEC provides this service and <br /> a cost estimate will furnished upon request. <br /> . <br />