Laserfiche WebLink
<br /> o6h2/92 12:33 FAX 612 487 2083 Ba1y]{ & Wiseman I4J 009 <br /> project proceeding as approved. Nobody eVer mentioned any kind <br /> . of moratorium, or any proposed changes in zoning ordinances. <br /> With all that in mind, I proceeded as if the status of the <br /> approval was the same as prior to December of 1990. <br /> of the six conditions that I have needed to meet prior to <br /> ~.. .", . <br /> building permit issuance, they can still all be timely met so I <br /> can close on the financing. First, two lots need to be combined <br /> into one, a small legal matter. Second, I need to provide an <br /> access easement over Control Data's entrance drive, which has <br /> already been agreed to by Control Data, subject only to final <br /> drafting. Third, I need to grant easements for fire lanes. The <br /> fire lanes are entirely on my property and have already been <br /> approved by the Fire Chief. Fourth, I have already obtained the <br /> . Rice Cree:k Water Shed District permit, which is in my possession. <br /> (See Exhibit A) . Fifth, I need to meet park dedication <br /> requirements. A letter is already prepared for park dedication. <br /> Last, I need to post a landscaping bond, and I believe it can be <br /> done quite easily. All of these items that the City has <br /> requested as necessary for building permit approval, can be <br /> timely completed to satisfy the city.s requirements. <br /> My total expenditures of nearly $114,000.00 have been based <br /> on the interpretations of the city, and my belief and reliance <br /> that the City approved my site plan and would grant me the perntit <br /> that they said they would. <br /> . <br /> 5 <br />