My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-15-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 06-15-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:07 PM
Creation date
11/6/2006 2:39:46 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> FAX 612 487 2083 Bal,'I{ & Wi seman 141 009 <br /> 06/12/92 12: 3.3 <br /> project proceeding as approved. Nobody eve.r mentioned any kind <br /> . of moratorium, or any proposed changes in zoning ordinances. <br /> with all that in mind, I proceeded as if the status of the <br /> approval was the same as prior to December of 1990. <br /> Of the six conditions that I have needed to meet prior to <br /> ",_.,. <br /> building permit issuance, they can still all be ti~ely met so I <br /> can close on the financing. First, two lots need to be combined <br /> into one, a small legal matter. Second, I need to provide an <br /> access easelllent over Control Data's entrance drive, which has <br /> already been agreed to by Control Data, subject only to final <br /> drafting. Third, I need to grant easements for fire lanes. The <br /> fire lanes are entirely on my property and have already been <br /> approved by the Fire Chief. Fourth, I have already obtained the <br /> . Rice Creek Water Shed District permit, which is in my possession. <br /> (See Exhibit A) . Fifth, I need to meet park dedication <br /> requirements. A letter is already prepared for park dedication. <br /> Last, I need to post a landscaping bond, and I believe it can he <br /> done quite easily. All of these items that the City has <br /> requested as necessary for building permit approval, can be <br /> timely completed to satisfy the City's requirelllents. <br /> My total expenditures of nearly $ll4,OOO.QO have been based <br /> on the interpretations of the city, and my belief and reliance <br /> that the City approved my site plan and 'Would grant me the pe=.it <br /> that they said they 'Would. <br /> . <br /> 5 <br /> -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.