My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-27-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 07-27-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:08 PM
Creation date
11/6/2006 2:40:04 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> --- <br /> . <br /> Arden Hills Council 9 July 13, 1992 <br /> that they could begin in late August and be completed in . <br /> September. <br /> FRANCIS PODLAS~K DRIVEWAY ISSUE <br /> This agenda item was continued from the June 29, 1992 <br /> Counci 1 meeting. Counci 1 was in receipt of correspondence <br /> from Engineer Graham, wherein Graham, as directed by <br /> Counci 1 , determined a cost of $1,500 for pavement removal <br /> and excavation from Mr. Podlasek's driveway at 4410 North <br /> Snelling Avenue. <br /> Counci 1 was also in receipt of correspondence from Mr. <br /> podlasek outlining a chronology of events leading to his <br /> dissatipfaction with his driveway as part of the <br /> reconstruction of North Snelling Avenue, as we 11 as three <br /> estimates solicited by Mr, Podlasek. <br /> Mr, podlasek stated that of the three bids he received <br /> (ranging from $1,830 to $2,240) he preferred the $2,240 bid <br /> because it addressed necessary landscaping of his yard in <br /> addition to correcting his driveway. <br /> Engineer Maurer commented that Engineer Graham's estimate <br /> does not address trees or landscaping and includes less fill . <br /> removal than the three estimates Mr, Podlasek received. <br /> Councilmember Malone noted per Graham's correspondence that <br /> if the driveway would have been cut back 40', as originally <br /> recommended to Mr. Podlasek as part of the North Snelling <br /> Avenue Reconstruction project, the cost would have been <br /> approximately $376. Maurer explained that since street <br /> reconstruction projects do not typically address landscaping <br /> or trees, the $376 figure does not include those items. He <br /> added that performing corrective work now will also be more <br /> expensive simply because it is not part of a large project, <br /> Mayor Sather commented that he considers landscaping an <br /> improvement to the private property, unrelated to the <br /> driveway issue, Councilmember Mahowald concurred and <br /> stated that landscaping work is also beyond the scope of <br /> what would have been done as part of the North Snelling <br /> Avenue Reconstruction project. <br /> Mr. Podlasek said that as a result of the reconstructed <br /> street, he has given up trees and acceptable landscaping and <br /> he thinks Council would agree if they were to view his <br /> property. <br /> Councilmember Hicks commented that if Mr. Podlasek had taken . <br /> action while the contractor was still working the street <br /> reconstruction project, he could have avoided the higher <br /> __n____ <br />
The URL can be used to link to this page
Your browser does not support the video tag.