Laserfiche WebLink
<br /> . ri/,lttiJ' -:J CONSULTING ENGINEERS <br /> Maier Stewart & Associates Inc. <br /> August 27, 1992 <br /> File: 520-026-20 <br /> Honorable Mayor and City Council <br /> City of Arden Hills <br /> 1450 West Highway 96 <br /> Arden Hills, MN 55112 <br /> RE: BID OPENING <br /> ARDEN PLACE STORM SEWER IMPROVEMENTS <br /> Dear Council Members: <br /> Bids were received and opened at 9:00 a,m. on August 27, 1992, for the above-referenced <br /> project. There were seven plan holders and three bids were received. Following is a list of the <br /> . bidders and their bids. An itemized bid tabulation is also attached, The bids were requested <br /> with the options of providing either reinforced concrete pipe (RCP) or high density plastic pipe <br /> (HDPE) , <br /> Contractor RCP HDPE <br /> Ro-So Contracting, Inc. $29,508.00 $26,048.00 <br /> Brown & Cris, Inc. 33,520,00 31,528.00 <br /> W, B, Miller, Inc. 34,389.00 31,655.00 <br /> It would be our recommendation that HDPE pipe be used on this project. <br /> We have worked with Ro-So Contracting, Inc" on projects in Lexington, Centerville, and <br /> Mahtomedi, and have found them to be very cooperative in completing the work to all <br /> specifications. <br /> The estimated construction cost presented at the various public hearings for this work was <br /> $24,000.00. Discussions with the Contractors indicate that the bid was higher due to the limited <br /> work area, particularly along Arden Place in front of 1553 Arden Place. Using the overhead <br /> figure of 25 %, the project cost based on the low bid using HDPE pipe is $32,560,00. <br /> . <br /> 1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612,774-6021 <br /> 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS. MINNESOTA 55441 612-546-0432' Equal Opportunity Employer <br />