<br /> -
<br /> 810 TlBUllTlON
<br /> . ------------------------~----------
<br /> PROJECT: ARDEN PLAtE STORM DRAINAGE IMPROVEMENTS
<br /> OWNER: CITY OF ARDEN HILLS, MINNESOTA
<br /> OPENING DATE: AUGUST 27, 1992
<br /> ENGINEER: MAIER STEWART AND ASSOCIATES, INC,
<br /> ---------------------------------------:------------------;-----------;------------:-----------:------------:-----------:------------:
<br /> ITEM ITEM DESCRIPTION : :RO'SO CONTRACTING, INe. :BROWN 6 cm, INC, :W,B, NILLER, IMC, :
<br /> NO. :UMIT QUANTITY :UNIT PRICE TOTAL PRICE :UNIT PRICE TOTAL PRICE :UNIT PRICE TOTAL PRICE:
<br /> : : (I) (I) : (I) (I) : (I) (I) :
<br /> ---------------------------------------------------------:-----------:------------:-----------:------------:-----------:------------:
<br /> SCHEDULE 1,1 STORN SEWER (RCP)'
<br /> ----------------------------------
<br /> t 12' RC PIPE, CLASS III lf 44\ 32,11 1mS,II 51.11 22211,11 51.11 22641.11
<br /> 212' RCP APRON EA 1 611,11 GII,II 811,11 SII,II SII,II 511,11
<br /> 3 CATCHBASIN, BEEHIVE EA 1 611.11 GII,II 1111.11 1111,11 751,11 751,11
<br /> 448'MANHOlE EA 2 1111,11 2111,11 1211,11 /HI.II 1211,11 2m,II
<br /> 5 CLASS III RANDOM RIP-RAP CY 3 111 ,II 311,11 111.11 311,11 111,11 311,11
<br /> 6 NANHOLE EXTRA DEPTH (OVER B') lf 1 111.11 111.1 I 111. II 111.11 95,11 95,11
<br /> 7 2' BIT, DRIVEWAY RESTORATION SY 61 21,11 1211,11 12.11 721.11 11,11 GII,II
<br /> B " BIT. STREET RESTORATION SY 211 21.11 4111,11 15,11 3111.11 13,11 2611,11
<br /> 9 SOD, TYPE LAWN 6 BOULEVARD SY 2111 3,25 6511.11 1.51 3111.11 2.25 4511,11
<br /> T SCHEDULE t,l STORN SEWER (RCP)--TOTAL 129,51B,1I 133,521,11 134,3S9.i1
<br /> . SCHEDULE l,t STORN SEWER (HOPE) ,
<br /> -----------------------------------
<br /> 1 12' HOPE PIPE lF W 26,11 1164S,II 4G,II 21618.11 ~5,1I 21161.11
<br /> 2 12' CM APRON EA 1 211 ,II 211,11 411,11 411.11 2&1,11 251.11
<br /> 3 CATCHBASIN, BEEHIVE EA 1 611.11 GII,II 1111,11 1111,11 751,11 751,11
<br /> ~ l8' ""NHOLE EA 2 1111,11 2111,11 1211,11 2411.11 1211.11 me,lI
<br /> 5 CLASS III RANDOM RIP-RAP CY 3 111.11 311,11 111,11 311,11 111.11 311,11
<br /> G MANHOLE EXTRA DEPTH (OVER B') lF 1 111.11 111,11 111.11 111,11 95,11 95,11
<br /> 7 2' 8IT, DRIVEWAY RESTORATION SY 61 21,11 1211,11 12,11 721.11 11,11 GII,II
<br /> 8 3' BIT, STREET RESTORATION SY 211 21.11 4111.11 15.11 3111,11 13,11 2611.11
<br /> 9 SOD, TYPE lAWN 6 BOULEVARD SY 2111 3,11 G11I,11 1.51 3111.11 2,25 4511,11
<br /> T SCHEDULE 1.1 STORM SEWER (HOPE)--TOTAl 12G,148.11 131,528.11 13t.655.11
<br /> , THE OWNER SHALL AWARD THE BID BASED ON EITHER BID SCHEDULE AND RESERVES
<br /> THE RIGHT TO DETERMINE THE PIPE NATERIAl TO BE USED ON THE PROJECT,
<br /> I HEREBY CERTIfY THAT THIS IS AN ACCURATE TABULATION Of THE 8IOS
<br /> RECEIVED FOR THE ABOVE MENTIONED PROJECT.
<br /> ,
<br /> , /f~V ,1~k ,
<br /> ~ NAME: MARX J. GRAHAN, P.E.
<br /> , DATE: AUGUST 27,1992
<br /> MN REG, NO,: 19t31
<br /> }
<br /> .
<br />
|