Laserfiche WebLink
Discussion• <br />Staff requests direction from the EDA on gateway signs. One reason for this discussion is that the <br />EDA discussed a large gateway sign at the corner of Highway 96 and Lexington, opposite the <br />existing Shoreview sign. This is a large expense, $270,000, in the CIP and will have implications <br />for the budget if the EDA wants to pursue this or not. Should the EDA decide the Highway 96 <br />gateway sign is no longer a priority, or other gateway signs, the EDA could look to repurpose these <br />funds. <br />Budget Impact <br />N/A <br />Attachments <br />A. 2024 CIP <br />B. Gateway Sign Maps <br />C. October 24, 2022 EDA Minutes <br />D. 2018 EDA Memo <br />E. WSB 2018 Concept Design <br />Page 2 of 2 <br />