Laserfiche WebLink
o 2024 AUAR Update — Dual left turns and through lanes have been constructed for the <br />westbound approach. <br />2030 Minimum Development Build Conditions (Recommendations from 2014 AUAR) <br />• Mounds View Boulevard & County Road H — Construct dual eastbound left turn lanes. <br />o 2024 AUAR Update — Dual left turn lanes have been constructed for the eastbound <br />approach. <br />• CSAH 96 & North Heights/TCAAP South Access— Install additional through lane in the westbound <br />direction. <br />o 2024 AUAR Update— Based on the results of the traffic analysis, this is no longer believed <br />to be a necessary mitigation. <br />2030 Maximum Development Build Conditions (Recommendations from 2014 AUAR) <br />• Install 1-35W northbound ramp connecting to the roundabout along County Road H. <br />o 2024 AUAR Update — Northbound 1-35W exit was constructed along with the construction <br />of the roundabout on County Road H. <br />2040 Build Conditions (New Mitigations Proposed) <br />• CSAH 96 & North Heights/TCAAP Access — Change the lane use of the southbound through lane <br />to allow right turns as well. <br />APPENDIX A: EXHIBITS <br />APPENDIX B: TURNING MOVEMENT COUNTS <br />APPENDIX C: SIMTRAFFIC AND RODEL REPORTS <br />I. EXISTING TRAFFIC REPORTS <br />II. 2040 NO -BUILD TRAFFIC REPORTS <br />III. 2040 MINIMUM DENSITY BUILD TRAFFIC REPORTS <br />IV. 2040 MAXIMUM DENSITY BUILD TRAFFIC REPORTS <br />V. 2040 MAXIMUM DENSITY ALTERNATE BUILD TRAFFIC REPORTS <br />VI. 2040 MAXIMUM DENSITY ALTENRATE BUILD TRAFFIC REPORTS (MITIGATED) <br />TCAAP AUAR Update I Traffic Analysis <br />April 2024 <br />