Laserfiche WebLink
<br /> _. ~- <br /> Page 10 <br />---- City of Arden Hills, Minnesota <br />.. AEC Project No. MN 1410 <br />.. 3.0 ENGINEERING COST ESTIMATES <br /> 3.1 Interior structural repairs $ 15.250.00 <br />II 3.2 Interior wet coating <br /> Type of coating - epoxy system $ 38.125.00 <br />.. 3.3 Interior dry coating <br /> Type of coating - epoxy system $ 30.100.00 <br />, 3.4 Exterior structural repairs $ 5.100.00 <br /> 3.5 Exterior coating * <br />, Type of coating - epoxy/urethane system $ 139.925.00 <br /> 3.6 Engineering specifications and <br /> inspection fee $ 24.500.00 <br />. 3.7 Estimated Total Cost $ 253.000.00 <br />~ 3.8 Estimated job duration 7 weeks. <br /> * Includes the cost of exterior containment. <br />, Report submitted by: <br />, AEC ENGINEERING, INC. <br />'hE~~ <br />QI P esident <br />, 7)~~ n-; 177';1. <br /> Date <br />. Enclosures - Field Inspection Report <br /> - Appendix A <br /> - Appendix B <br />I - Appendix C <br /> - Appendix 0 <br />, <br />IJ <br />